Recently, Shandong Province released the "14th Five-Year Plan", which shows that during the "13th Five-Year Plan" period, the total management of "scattered" enterprises exceeds 110,000, the reduction of crude steel production capacity of 2.1 million tons, 9.7 million tons of pig iron, 28 million tons of coking, coal production capacity of 52.76 million tons, the shutdown and withdrawal of electrolytic aluminum production capacity of 3.21 million tons, chemical parks from 199 to 84. During the 13th Five-Year Plan period, the total number of "loose and dirty" enterprises will be reduced to more than 110,000, crude steel capacity will be reduced to 2.1 million tons, pig iron will be reduced to 9.7 million tons, coking will be reduced to 28 million tons, coal will be reduced to 52.76 million tons, electrolytic aluminum will be shut down to 3.21 million tons, chemical parks will be reduced from 199 to 84, and chemical enterprises will be shut down to more than 4,000.
Planning for the 14th Five-Year Plan period on the aluminum industry to make plans: First, the 14th Five-Year Plan period, according to the relevant national industrial policy, the steel, ground refining, coking, coal power, electrolytic aluminum, cement, tires, flat glass, nitrogen fertilizer, ferroalloys and other key industries to strictly implement capacity replacement requirements, to ensure that the total capacity only reduce not increase. In principle, no longer approve new coal mining projects.
Second, to promote the restructuring of transportation. Support gravel, coal, iron and steel, electrolytic aluminum, electricity, coking, cement and other bulk cargo annual transport volume of more than 1.5 million tons of large industrial and mining enterprises and large logistics parks new (reform, expansion) to build railway lines.
Third, strengthen the control of greenhouse gas emissions. Based on the stable operation of the carbon market in the power generation industry, we will actively promote the entry of cement, electrolytic aluminum, steel and other industries into the national carbon emission trading market in accordance with the unified national deployment, so as to play the role of market mechanism to reduce carbon.
Fourth, the channel city (excluding Jinan City, Laiwu District, Steel City) has not completed the transformation of ultra-low emissions of iron and steel production capacity all out, and strictly prohibit new steel, ferroalloy, coking, electrolytic aluminum, casting, cement, plate glass and oil refining capacity. Strict implementation of the steel, cement, flat glass and other industries capacity replacement implementation.
Fifth, strengthen the environmental management of hazardous waste medical waste. Support the sharing of hazardous waste utilization and disposal facilities within large enterprise groups. Focus on strengthening the use of cyanide-containing tailings, waste salt, aluminum ash and other disposal capacity building. Encourage the disposal of hazardous wastes in the jurisdiction itself.